Structure diagram — site photo in preparation
- Start year
- 2024
- Country
- Uzbekistan
- Equipment types
- 05
About the project
To ensure the reliable and safe operation of the Ravotxoja water distribution facilities and to prevent the possibility of emergency situations, a management system and control-measurement devices (CMD) data have been implemented for "online monitoring" and the creation of an automated diagnostic control system. This system enables rapid decision-making and minimizes risks when problems arise.
An automated control system has also been implemented at the facility, which includes modern sensors and technologies for measuring important parameters such as water pressure, water level, and water flow. All data from the control-measurement devices is collected in real-time and analyzed using specialized software, helping to quickly address issues and ensure accurate decision-making.
To further enhance the system's effectiveness, sensors for measuring water pressure, water level, and water flow have been used, as well as automatic systems that ensure continuous monitoring of the status of all key elements of the water distribution network. These technologies improve the safety and reliability of the facility, minimizing the likelihood of emergencies.
No photographs of the site yet — a schematic diagram of the structure is shown.
Equipment used
Measurement and monitoring instruments installed on site.
- 01Water pressure and level measurement sensors
- 02Automated diagnostic systems
- 03Online monitoring systems
- 04Water flow measurement sensors
- 05Automatic control systems