Stage 1 of 5
Survey
We visit the site and study the hydraulic structure, the existing networks and the operating conditions, collecting the data the design is built on.
Engineering company · Tashkent · since 2020
We automate the control of reservoirs and water systems and design hydraulic structures — modern solutions built for the needs of the future.

WATER AUTOMATING PROJECT
About the company

Founded in 2020, WATER AUTOMATING PROJECT automates hydraulic structures and reservoirs across Uzbekistan — including the Hisorak, Okhangaron, Andijan, Charvak and Tupolang reservoirs.
Automation and monitoring of gates, pumping stations and hydraulic schemes is another core area of our work.
Learn moreFull cycle
We run the project end to end — from the first site visit to service support. One contractor is responsible for the survey, the design, the installation and the commissioning.
All servicesStage 1 of 5
We visit the site and study the hydraulic structure, the existing networks and the operating conditions, collecting the data the design is built on.
Stage 2 of 5
We prepare the design documentation: automation diagrams, selection of instruments and equipment, hydraulic engineering solutions — and agree it with the client and the review bodies.
Stage 3 of 5
We supply and install the equipment, lay the communication and power lines and assemble the control cabinets.
Stage 4 of 5
We configure the system, check the sensors and actuators, run acceptance tests and train the client's staff.
Stage 5 of 5
After handover we stay in touch: warranty and service maintenance, software updates and consulting.
Portfolio
Six reservoirs and water distribution structures in Uzbekistan — each with a passport, equipment list and photographs.
Directions
From automation of hydraulic structures to surveys and land reclamation: all of the company's services are grouped into four directions.

Automated control systems for hydraulic structures and reservoirs: instrumentation, water facility control systems, autonomous power supply for remote sites.
Services in this line
Geography
Office in Tashkent. Projects on dams and hydraulic structures across the country.
Locations of projects 5 and 6 are approximate.

Latest story ·
The Ministry of Water Resources has summed up the first nine months of 2026. Water-level monitoring devices were installed at 43 reservoirs, fibre-optic lines were laid at 9 of them, and 83 seismic stations were installed at 16 reservoirs. Water-withdrawal…



Partners
We value our partners and collaborate on successful projects in construction, water management, and hydro-node design.
Sisgeo
Huggenberger AG
Smart Solution SystemLLC
UZBEKHYDROENERGYJSC
ISO 9001:2015
Quality management system
View certificateDiscuss a project
Choose a line of work or a service: the topic goes into your request and the right specialist gets in touch.
Or reach us directly